More Lead Reins
Economical lead ropes with brass coloured swivel trigger clips.
1.8m (71") long.
..
From
£4.50
(inc. VAT)
£3.75
(ex. VAT)
Zesty coloured comfort hold lead ropes with brass coloured swivel trigger clips.
1.8m (71") long.
..
From
£6.99
(inc. VAT)
£5.83
(ex. VAT)
Twisted rope with strong Walsall clip.
1.8m (71") long.
..
From
£6.99
(inc. VAT)
£5.83
(ex. VAT)
Top quality English leather lead rein with a 30” heavy weight brass chain and spring clip.
Approximately 6’6” in length.
Leads can be personalised with a brass nameplate.
Handmade to order on site.
Note: This item is a made to order item ..
From
£74.50
(inc. VAT)
£62.08
(ex. VAT)