100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Turnout Rugs

The Tempest Original 300g turnout rug and neck set offers excellent winter warmth during cold weather. The set offers great layering options in changing weathers with a neck cover that attaches to the rug and fastens with touch close straps. Featu..
From £87.99 (inc. VAT) £73.33 (ex. VAT)
Horseware®’s Amigo® Bravo turnout rug is available here as a cosy 400g heavy weight winter rug, providing warmth and performance whilst maintaining comfort and freedom of movement for your horse. This robust rug loves soggy and cold weather, even ..
From £194.95 (inc. VAT) £162.46 (ex. VAT)
Specifically designed to fit foals, this turnout rug has a quick clip chest strap and belly straps for easy fitting. The generous, adjustable belly flap keeps the tummy warm and the rug is fully lined. Features: 200g polyfill 600 denier ri..
From £39.99 (inc. VAT) £33.33 (ex. VAT)
Horseware®’s best selling Amigo® turnout rug is available here as a 400g heavy weight winter rug ideal for keeping the wet, wind and cold out. Features: Strong 1200D polyester outer, waterproof and breathable Polyester lining with fibrefil..
From £187.99 (inc. VAT) £156.66 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo