100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Stable Sheets

This hard wearing rug is perfect for protecting your horse against dust and dirt in the stable and for light warmth when travelling or at shows. Features: Adjustable cross surcingles Twin chest straps Fillet string Lined over the shoul..
From £39.90 (inc. VAT) £33.25 (ex. VAT)
A great all-rounder, the Tempest Original stable sheet is useful for travelling and in the stable. Durable, close weave fabric is moisture wicking and fast drying to keep the horse comfortable during the summer months. Features: Lightweight ..
From £39.99 (inc. VAT) £33.33 (ex. VAT)
The Rambo® Stable Sheet features a microfibre lining (0g light)  which is made of a durable 1000D Ripstop Polyester Outer. Featuring a classic cut and design, the Rambo® Stable Sheet might look like 'just another stable sheet', but the secret’s in th..
From £107.95 (inc. VAT) £89.96 (ex. VAT)
Horseware's classic Amigo stable sheet has multiple uses including a stable sheet, travel rug or cooler. Features: Moisture management technology to give it a high wicking factor Classic cut design Double front closures Fillet string ..
From £59.95 (inc. VAT) £49.96 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo