100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Accessories

Synthetic sheepskin pad for use with paddock rollers...
From £12.00 (inc. VAT) £10.00 (ex. VAT)
This bib can be invaluable for show ponies and horses when presentation is everything. The lightweight satin fabric allows the rug to glide over vulnerable areas, such as the shoulders, chest and withers minimising the risk of hair loss, chafing or s..
From £10.99 (inc. VAT) £9.16 (ex. VAT)
Elastic surcingle for use over horse sheets and blankets. ..
From £10.50 (inc. VAT) £8.75 (ex. VAT)
This hardwearing clip on fillet strap features an elastic bungee encased in a bendy plastic tube to protect against muck and dirt. A popular alternative to the traditional fillet string. ..
From £3.99 (inc. VAT) £3.33 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo