100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Fly Sheets

This mesh fly rug does a great job of keeping the horse cool and comfortable whilst providing an effective barrier to flies and bugs. Features: UV reflective fabric helps guard against sun bleach Improved seamless neck design Lining to t..
From £47.99 (inc. VAT) £39.99 (ex. VAT)
In the Amigo Vamoose® Evolution fly rug Horseware are bringing together their innovative and super light disc front closure with the latest in Vamoose insect control technology. By choosing aqua and orange colours that are known to be difficult fo..
From £129.99 (inc. VAT) £108.33 (ex. VAT)
The Rambo Fly Buster Vamoose® is made from unique, patented, durable fabric that is super soft and comfortable whilst offering UV protection. Treated with anti-insect Vamoose® technology and built to last for many seasons. Features: Vamoose®..
From £149.95 (inc. VAT) £124.96 (ex. VAT)
Classic fly and UV protection can be found in Horseware's popular Amigo Aussie Allrounder. The lightweight polyester ripstop outer is water resistant and protects the horse's coat from UV damage as well as keeping flies at bay. Features: ..
From £98.50 (inc. VAT) £82.08 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo