100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Coolers and Fleeces

This deluxe fleece blanket from Horseware offers excellent thermal and wicking properties. Features: High quality double bonded, anti-pilling fleece Classic cut Double front closures with cross surcingles Effective..
From £105.00 (inc. VAT) £87.50 (ex. VAT)
This mesh cooler assists with safe cooling in warmer weather. Lightweight and airy mesh creates a micro-climate allowing moisture and heat to escape without causing a chill. Features: Highly breathable Allows moisture and heat to dissipate..
From £29.99 (inc. VAT) £24.99 (ex. VAT)
The Tempest Original Fleece is an indispensible rug for horse owners. This versatile rug can be used when travelling, after bathing or for cooling your horse or pony after exercise. Features: Highly moisture wicking Helps prevent chilling ..
From £33.99 (inc. VAT) £28.33 (ex. VAT)
Providing all year-round use, Bridleway’s quilted tech cooler offers highly efficient wicking properties making it ideal for use after exercise, during travelling, at shows and in the stable. The soft knitted quilt fabric connects with the body to tr..
From £61.00 (inc. VAT) £50.83 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo