100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More High Viz

Handmade to order on site, the fluorescent exercise sheet provides extra visibility on dull days as well providing showerproof protection and extra warmth for your horse. Features: Showerproof Reinforced edges at points of wear Cotton Ta..
From £57.60 (inc. VAT) £48.00 (ex. VAT)
A highly visible, waterproof exercise sheet with a warm fleece lining, ideal for wet weather exercising. Continental pattern fits around the saddle or over the rider’s legs Features: Fits around the saddle Can be fitting and removed wit..
From £52.99 (inc. VAT) £44.16 (ex. VAT)
For rear visibility on the road, the EQUI-FLECTOR® reflective tail strap helps keep the horse visible even from a distance. Held in place with a rubberised elastic strap and touch close fastenings. Team with other items from the EQUI-FLECTOR® range t..
From £5.25 (inc. VAT) £4.38 (ex. VAT)
The Equi-Flector breastplate is made in high visibility fabric with reflective detailing to help keep you and your horse visible in low light or on the road. Secured via the adjustable neck strap and through the girth loop. ..
From £15.99 (inc. VAT) £13.33 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo