100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Synthetic Headcollars

This economical headcollar is adjustable on the headpiece and features silver colour fittings. Double layer web. Excellent value for money. An ideal sales headcollar.   ..
From £5.25 (inc. VAT) £4.38 (ex. VAT)
Features: Cushioned, anti-chafe padding on the nose and head Fully adjustable nose Comfortable, customised fit Durable nylon web and rolled throat lash Chunky fittings ..
From £21.99 (inc. VAT) £18.33 (ex. VAT)
Made of woven polyester webbing coated with a copolymer developed by Zilco. Features:  Solid brass fittings Retains flexibility over a large temperature range Increased abraison, tear and crack resistance Sensitive feel (does not feel ..
From £66.50 (inc. VAT) £55.42 (ex. VAT)
Brighten up your look with the ARMA Fleece Headcollar & Lead Rope. Features: Fully adjustable at the nose and head Deep contoured noseband and head strap helps distribute pressure Padded fleece is soft and offers more comfort Convenien..
From £25.99 (inc. VAT) £21.66 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo