100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Leather Headcollars

Triple stitched American sytle headcollar with double buckle adjustments on the head and a rolled throat. English chestnut brown leather. One size – cob/full. Can be personalized with an engraved nameplate (See Nameplates and Tags page under..
From £62.50 (inc. VAT) £52.08 (ex. VAT)
Made in European leather with brass buckles to E J Wicks specifications – 1” width head, double adjustment on the head and adjustable nose.Can be personalized with an engraved nameplate (See Nameplates and Tags page under Headcollars)...
From £40.50 (inc. VAT) £33.75 (ex. VAT)
Top quality English leather padded headcollar with brass fittings. Padded nose and poll. Cob or Full. Black or Brown. Can be personalized with an engraved nameplate (See Nameplates and Tags page under Headcollars). ..
From £56.95 (inc. VAT) £47.46 (ex. VAT)
Made in European leather with brass buckles to E J Wicks specifications – 1” width head, double adjustment on the head and adjustable nose. Can be personalized with an engraved nameplate (See Nameplates and Tags page under Headcollars). ..
From £34.50 (inc. VAT) £28.75 (ex. VAT)

Customer Reviews

There are no reviews for this product.

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo