100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Lead Reins

Economical lead ropes with brass coloured swivel trigger clips. 1.8m (71") long. ..
From £4.50 (inc. VAT) £3.75 (ex. VAT)
Zesty coloured comfort hold lead ropes with brass coloured swivel trigger clips. 1.8m (71") long. ..
From £6.99 (inc. VAT) £5.83 (ex. VAT)
Twisted rope with strong Walsall clip. 1.8m (71") long. ..
From £6.99 (inc. VAT) £5.83 (ex. VAT)
Top quality English leather lead rein with a 30” heavy weight brass chain and spring clip. Approximately 6’6” in length. Leads can be personalised with a brass nameplate. Handmade to order on site. Note: This item is a made to order item ..
From £74.50 (inc. VAT) £62.08 (ex. VAT)

Customer Reviews

There are no reviews for this product.

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo