100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Overreach Boots

Woof Wear’s iVent® No-Turn Overreach Boot is the perfect fusion of performance and technology to provide outstanding protection against overreach injuries. Designed with a no-turn nodule which fits comfortably between the bulbs of the heel to keep t..
From £39.99 (inc. VAT) £33.33 (ex. VAT)
These neoprene over reach boots fom Arma offer protection and comfort for your horse. The neoprene outer protects against scuffs and blows whilst preventing rubbing around the pastern. Double touch close fastening secures. ..
From £11.99 (inc. VAT) £9.99 (ex. VAT)
This general-purpose overreach boot is designed to protect your horse during every day schooling and competition work. As added benefit it has an anti-spin device located in heel area to stop the boot spinning around the hoof. This also offers extra ..
From £25.99 (inc. VAT) £21.66 (ex. VAT)
Shock absorbing over reach boots with double sided touch close fastenings that will help to keep you and your horse seen whilst out and about. Features: Reflectve markings to aid visibility Shock absorbing neoprene Double sided touch clo..
From £14.99 (inc. VAT) £12.49 (ex. VAT)

Customer Reviews

There are no reviews for this product.

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo