100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Leg Bandages

These quilted, cushioned bandage pads offer extra protection and prevent pressure points under bandages. Available in two sizes to fit varying leg lengths. Set of 4. ..
From £15.99 (inc. VAT) £13.33 (ex. VAT)
For use in the stable, travelling and in the competition arena. Not only protects but when chilled acts as an instant cold compress aiding recovery from strenuous exercise and hard ground trauma.One size...
From £15.20 (inc. VAT) £12.67 (ex. VAT)
These luxurious fleece polo bandages are suitable for use during schooling, dressage warm-up or gentle exercise, providing extra support around the leg.  Features: Manufactured from a new luxurious fleece  Designed to be used either with o..
From £19.20 (inc. VAT) £16.00 (ex. VAT)
The ARMA fleece bandages are ideal for support and protection when travelling, during exercise or at work. Non-stretch soft fleece with touch close fastenings for a secure fit.  Features: Non-stretch fleece construction Pack of four 3m l..
From £13.45 (inc. VAT) £11.21 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo