100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Fly Control

This extra strength insect repellent contains one of the strongest and most effective formulations on the market, with optimum levels of 20% DEET for guaranteed protection from all flies and biting insects. ..
From £17.95 (inc. VAT) £14.96 (ex. VAT)
Power Phaser insect repellent gives seven hours of protection, even if your horse sweats. An optimised blend of active ingredients guarantees stay-off effect and long-lasting effectiveness. The repellent-loss effect associated with perspiration is mu..
From £19.95 (inc. VAT) £16.63 (ex. VAT)
This season create your own ‘no fly’ zone using NAF Off’s Deet Power Performance Spray. Winner of Horse and Rider’s Best in Test 2023 award, this provides all day protection from flies and insect menace. ..
From £19.99 (inc. VAT) £16.66 (ex. VAT)
Long lasting, effective citronella spray for summer coats. ..
From £13.50 (inc. VAT) £11.25 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo