100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Blinkers

The Fenwick LT Liquid Titanium Mask is the original therapeutic calming mask which can help your horse relax and focus naturally. The addition of silicone ear inserts has added extra calming properties and also made it acceptable for use in racing in..
From £138.00 (inc. VAT) £115.00 (ex. VAT)
The Zilco stretch race hoods are made from 4-way stretch spandex/elastane material and are fastened with clips under the neck, which include touch-tape straps for extra adjustment. This visor has full cups stitched onto the hood, with slots cut in..
From £41.99 (inc. VAT) £34.99 (ex. VAT)
Airlite is a very light mesh nylon with some stretch, allowing full air circulation. The hoods are fastened with clips and elastic straps under the neck. The full cup on this hood is laced on making it adjustable. Please note: These are sized for ..
From £35.99 (inc. VAT) £29.99 (ex. VAT)
Airlite is a very light mesh nylon with some stretch, allowing full air circulation. The hoods are fastened with clips and elastic straps under the neck. The half cup on this hood is laced on making it adjustable. Please note: These are sized for ..
From £32.99 (inc. VAT) £27.49 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo