100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Veterinary Headcollars

Recovery headcollars handmade on site to order. Used by veterinary practices during procedures involving anaesthesia. Available with a buckle on either the near or off side. "For horses recovering from general anaesthesia, rope assistance is, q..
From £144.00 (inc. VAT) £120.00 (ex. VAT)
Felt padded headcollar for use on horses with facial injuries or lesions where the headcollar needs to be raised away from the face. Thick felt pads are attached to a standard headcollar and an additional ring is stitched onto the nose for varied ..
From £96.00 (inc. VAT) £80.00 (ex. VAT)
A comfortable solution for horses suffering from uveitis or other eye injuries or traumas. Synthetic sheepskin padded to provide ultimate comfort for the horse. Made to order on site with near or off side eye shield as required. ..
From £120.00 (inc. VAT) £100.00 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo