More Lead Reins
Economical lead ropes with brass coloured swivel trigger clips.
1.8m (71") long.
..
From
£4.50
(inc. VAT)
£3.75
(ex. VAT)
Zesty coloured comfort hold lead ropes with brass coloured swivel trigger clips.
1.8m (71") long.
..
From
£6.99
(inc. VAT)
£5.83
(ex. VAT)
Twisted rope with strong Walsall clip.
1.8m (71") long.
..
From
£6.99
(inc. VAT)
£5.83
(ex. VAT)
Top quality English leather lead rein with a Newmarket chain. This lead has a brass double ended chain with Walsall clips at each end and is used in showing and for leading a horse by the bit.
Leads can be personalised with a brass nameplate.
H..
From
£77.50
(inc. VAT)
£64.58
(ex. VAT)
Customer Reviews
There are no reviews for this product.