100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Hats

This KEP SMART helmet is the entry level helmet from KEP Italia. This stylish helmet combines unique technology with ultimate comfort and safety to make it a popular arrival on the market. Features: Lightweight yet strong outer shell KEP A..
From £199.99 (inc. VAT) £166.66 (ex. VAT)
100% designed and made in Italy, the CROMO 2.0 model is the evolution of the original CROMO helmet. Features: Polycarbonate outer shell is both lightweight and resistant KEP AIR CONTROL SYSTEM is enhanced with additional ventilation slits ..
From £300.00 (inc. VAT) £250.00 (ex. VAT)
The E-Light helmet is KEP Italia’s carbon helmet. It is lightweight and strong, with a sophisticated design. The carbon fibre outer shell is made entirely by hand, using an artisan autoclave processing technique; this creates excellent results in ter..
From £600.00 (inc. VAT) £500.00 (ex. VAT)
The Champion Euro Deluxe Plus skull is a traditional style helmet featuring a lightweight injection moulded ABS shell and secured by a four point harness in soft suede leather. Polyurethane outer allows for easy cleaning Rear drawstring ..
From £105.00 (inc. VAT) £105.00 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo