100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Hat Covers

Lycra hat silk with EJ Wicks logo on the back. Features: Small peak (also known as an American peak) Bobble EJ Wicks logo on the rear. Any coloured bobble can be stitched onto each hat silk. If you have a specific request please con..
From £16.99 (inc. VAT) £14.16 (ex. VAT)
This smart, traditional velvet hat cover is made from 100% premium cotton velvet. Perfect for hunting, eventing and other Pony Club disciplines. ..
From £30.00 (inc. VAT) £25.00 (ex. VAT)
Made from Lycra for a super sleek fit, these hat covers are a fun, eye-catching addition to your riding wardrobe. The detachable button top can be swapped for a compatible pompom for added fun. Features: Lycra for a super sleek fit Rigid p..
From £12.99 (inc. VAT) £10.83 (ex. VAT)
Top off your brightest 'be seen' outfit with an EQUI-FLECTOR® hat cover to stay as visible as possible in poor light conditions or when road riding. Brightly coloured with reflective stars. One size. ..
From £13.99 (inc. VAT) £11.66 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo