100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Mane and Tail

Large aluminium mane comb. 105mm long ..
From £1.60 (inc. VAT) £1.33 (ex. VAT)
Small aluminium comb. 105mm long. ..
From £1.10 (inc. VAT) £0.92 (ex. VAT)
The perfect brush for your horse’s mane and tail with rubberised grips for a comfortable, secure hold. ..
From £5.50 (inc. VAT) £4.58 (ex. VAT)
The SoloComb has been described as being amongst the most humane inventions within the equestrian industry, with endorsements by the worlds prefessionals and vets. Features: Top quality, precision-engineered hardened stainless steel blades ..
From £23.40 (inc. VAT) £19.50 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo