100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Hoof Care

Metal hoof pick with a coloured vinyl coated handle.     ..
From £1.65 (inc. VAT) £1.38 (ex. VAT)
Plastic handled hoof pick with a metal pick and nylon brush for removing mud from your horses hooves.     ..
From £1.25 (inc. VAT) £1.04 (ex. VAT)
Farrier’s Friend Hoof Oil is a blend of natural waxes and mineral oils specifically formulated to help maintain healthy hooves and sound hoof growth. It improves water resistance in wet weather and aids moisture retention in dry, hot weather makin..
From £18.95 (inc. VAT) £18.95 (ex. VAT)
Plastic hoof oil brush with a handy lid to prevent products transfering from the brush onto other surfaces and also helps to stop brushes drying out. ..
From £1.99 (inc. VAT) £1.66 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo