100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Brushes and Combs

Synthetic block dandy brush from Stablemate. Plastic back with synthetic bristles. ..
From £6.95 (inc. VAT) £5.79 (ex. VAT)
Flicky or soft dandy brush from Stablemate. Extra long bristles for removing dust and dirt. Plastic back with synthetic bristles. ..
From £7.95 (inc. VAT) £6.63 (ex. VAT)
This Mexican Whisk or Salmon Dandy brush is a popular staple in many grooming kits. Beechwood backing with a mexican whisk bristles. ..
From £11.99 (inc. VAT) £9.99 (ex. VAT)
Plastic sweat scraper with flexible rubber on one side for removing excess water from a horse’s coat. ..
From £2.99 (inc. VAT) £2.49 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo