100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Girths

Synthetic girth loop from Zilco designed to loop over the girth and allow you to attach training aids, martingales and other clip ended attachments to the girth as required. One size. ..
From £6.75 (inc. VAT) £5.63 (ex. VAT)
The new Thorowgood Cob Girth features split ends at BOTH ends to reach splayed Point and Balance strap girthing arrangements, making this girth a particularly good choice for Cobs or other big barrelled conformations. Non-elasticated to hold the s..
From £28.95 (inc. VAT) £24.13 (ex. VAT)
Thorowgood's award-winning Airoform GP girth uses stay-soft Airoform cushioning which continues to stay soft no matter how much use it gets. This design also eliminates any pinching of the sensitive skin behind the elbows. Improved new double-layer s..
From £28.95 (inc. VAT) £24.13 (ex. VAT)
Thorowgood’s award-winning girth in a dressage style is gently curved for a snug, contoured fit. Made using the same stay-soft Airoform cushioning, it really does stay that way no matter how much use it gets and eliminates any pinching of the sensiti..
From £34.95 (inc. VAT) £29.13 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo