100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Spurs

These high quality, stainless steel spurs from Sprenger are designed with comfort in mind. Features: Unisex 25mm spur Break-proof, high quality stainless steel Unique fit and design eliminates pressure and movement. Note: These do..
From £41.95 (inc. VAT) £34.96 (ex. VAT)
These high quality, stainless steel spurs from Sprenger are designed with comfort in mind. Features: Unisex 25mm spur rowel with comfort roller Vertical thick and smooth rowel for a soft contact Break-proof, high quality stainless stee..
From £77.95 (inc. VAT) £64.96 (ex. VAT)
These high quality, stainless steel spurs from Sprenger are designed with comfort in mind. Features: Unisex 20mm flat spur Break-proof, high quality stainless steel with a lifetime breakage guarantee Unique fit and design eliminates pr..
From £41.95 (inc. VAT) £34.96 (ex. VAT)
Stainless steel and plastic roller ball spurs. The rolling ball spur end is more gentle than a standard spur as the ball end rolls rather than jabs, helping to prevent marking Features: Ladies and mens fit available 30mm spur Gentle plas..
From £23.99 (inc. VAT) £19.99 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo