100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Fly Masks and Veils

This fly mask is part of a new range of ergonomically designed fly masks from Woof, packed full of unique features to protect your horse from flies and UV rays. A separate attachable nose is also available to increase the versatility of your mask to ..
From £25.99 (inc. VAT) £21.66 (ex. VAT)
This fly mask is part of a new range of ergonomically designed fly masks from Woof, packed full of unique features to protect your horse from flies and UV rays. A separate attachable nose is also available to increase the vesatility of your mask to f..
From £23.99 (inc. VAT) £19.99 (ex. VAT)
Part of a new range of ergonomically designed fly masks from Woof, this nose protector is designed to attach to all of the Woof fly masks to protect your horse from flies and UV rays. Features: Ergonomically shaped to fit around the nose 6..
From £8.49 (inc. VAT) £7.08 (ex. VAT)
The Metabug FLY DEFENCE fly mask keeps horses protected from flies and biting insects as well as providing protection from UV rays. Features: Close contact construction to keep insects out Climate control fabrics 3D mask and freedom fit ..
From £20.00 (inc. VAT) £16.67 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo