100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Field Equipment

The Durabale hay feeder has been specifically designed to significantly reduce the cost associated with feeding hay to horses and prevent injuries sustained from traditional metal hay feeders.  This incredibly strong, UV-stabilised and shatterproo..
From £990.00 (inc. VAT) £825.00 (ex. VAT)
With no sharp metal edges or corners, this excellent rotationally moulded Duracorral paddock pen is particularly suitable for horses. Incredibly lightweight, with only one person setup, this virtually indestructible plastic corral pen can be extended..
From £4,620.00 (inc. VAT) £3,850.00 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo