100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Endurance Reins

Made with 19mm Matt finish PVC coated webbing and featuring white rubber grips with stainless steel fittings. Length: 132cm long ..
From £66.99 (inc. VAT) £55.83 (ex. VAT)
These reins are made from 19mm coated webbing. They attach to the bit with light yet strong stainless steel rein snaps and buckle together at the centre. Complete with rein stops for those who use a martingale. Length: 132cm long (46cm rubber pimp..
From £68.99 (inc. VAT) £57.49 (ex. VAT)
These reins are made from 16mm webbing and featurelightweight yet strong stainless steel rein snaps for quick and easy fitting and removal. The grips are made from soft, pliable rubber that is extremely comfortable in the hands and offer excellent..
From £76.99 (inc. VAT) £64.16 (ex. VAT)
Made from a polyester material with interwoven rubber, creating a product that is lightweight yet strong, with fantastic grip in wet conditions. Featuring stainless steel trigger snaps for attaching to the bit and hook and loop fastening at the centr..
From £38.99 (inc. VAT) £32.49 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo