100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Bits

Perfect for first ridden or in hand horses due to the soft, flexible rubber mouthpiece which is kind on the horse's mouth. 21mm mouthpiece thickness. ..
From £12.60 (inc. VAT) £10.50 (ex. VAT)
The unique cheek design allows for multiple adjustment to increase or decrease poll pressure. PVC coated webbing straps and waffle padded lining. ..
From £33.99 (inc. VAT) £28.33 (ex. VAT)
Large 3.5” loose rings on this hollow mouth bit help to prevent the bit being pulled through the horse’s mouth. The thick hollow mouth keeps the bit lightweight making it ideal for racing. ..
From £18.60 (inc. VAT) £15.50 (ex. VAT)
The hollow mouthpiece makes this bit very light despite being slightly thicker at 21mm. The nutcracker action works by applying pressure to the bars and squeezing the tongue. ..
From £19.80 (inc. VAT) £16.50 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo