100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Endurance Martingales

An adjustable martingale designed to clip to the centre ring on a breastplate. Made with Matt finish PVC coated webbing and featuring stainless steel fittings. ..
From £29.99 (inc. VAT) £24.99 (ex. VAT)
The new Zilco Training range of products offer the look that traditionalists prefer with all the benefits of synthetic materials for which Zilco is so reknowned. Made from 12mm (1/2”) synthetic strapping that is softer on the hands and has a matt ..
From £43.75 (inc. VAT) £36.46 (ex. VAT)
This is an adjustable martingale with lighter, stronger stainless steel fittings. This model is designed to clip to the centre ring on all Zilco endurance breastplates. The rings feed through the reins to act like a running martingale. ..
From £26.50 (inc. VAT) £22.08 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo