100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Endurance Bridles

The Deluxe Endurance Bridle is a two part model that offers the option to quickly remove the brow and cheeks (bridle part) while leaving the halter part in place. This is done by simply releasing the snaps on the browband. All fittings are stainless ..
From £53.99 (inc. VAT) £44.99 (ex. VAT)
The Deluxe Endurance Bridle is a two part model that offers the option to quickly remove the brow and cheeks (bridle part) while leaving the halter part in place. This is done by simply releasing the snaps on the browband. All fittings are stainless ..
From £32.99 (inc. VAT) £27.49 (ex. VAT)
The Marathon Bridle is a more traditional halter/bridle combination, with an adjustable throatlash and noseband. It features quick release snaps on the cheek straps to allow easy conversion from bridle to halter. The Zilco Arab size has been desig..
From £87.99 (inc. VAT) £73.33 (ex. VAT)
A new lighter weight halter/bridle combination made from Matt finish PVC coated webbing with white PVC waffle padding on the headpiece. Quick release snaps on cheeks allow for easy conversion from bridle to halter. This bridle has plenty of room for ..
From £94.99 (inc. VAT) £79.16 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo