100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Endurance Breastplates

Synthetic girth loop from Zilco designed to loop over the girth and allow you to attach training aids, martingales and other clip ended attachments to the girth as required. One size. ..
From £6.75 (inc. VAT) £5.63 (ex. VAT)
Designed to fit on a variety of breastplates, either at the chest or the shoulder (in five-point designs). Made from Zilco’s durable waffle outer and lined with washable synthetic fleece. ..
From £11.50 (inc. VAT) £9.58 (ex. VAT)
The Deluxe Endurance Breastplate is padded for extra comfort with a specially shaped black PVC waffle material that disperses pressure evenly and reduces chafing. It also features lighter, stronger stainless steel snaps for easy fitting and remova..
From £86.99 (inc. VAT) £72.49 (ex. VAT)
The Deluxe Endurance Breastplate is padded for extra comfort with a specially shaped black PVC waffle material that disperses pressure evenly and reduces chafing. It also features lighter, stronger stainless steel snaps for easy fitting and remova..
From £92.99 (inc. VAT) £77.49 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo