100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Saddle Bags

Clips to the D ring on most saddles. Includes one 600ml drink bottle. Green ..
From £12.25 (inc. VAT) £10.21 (ex. VAT)
Comes with two 600ml plastic drink bottles in an insulated bag on one side and two zip pockets on the other. ..
From £34.85 (inc. VAT) £29.04 (ex. VAT)
Pair of neat bags which clip to the pommel dees of the saddle. Suitable for wallet, sunglasses, snacks and other personal items. ..
From £32.99 (inc. VAT) £27.49 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo