100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Ear Plugs

Moulded rubber ear plugs designed to reduce noise exposure for horses. Clip attachment on cord. ..
From £8.90 (inc. VAT) £7.42 (ex. VAT)
Sheepskin ear plugs designed to reduce noise exposure for horses. Clip attachment on cord. ..
From £11.40 (inc. VAT) £9.50 (ex. VAT)
Memory foam ear plugs designed to reduce noise exposure for horses during racing or training. The memory foam moulds to the shape of the ear and has the ability to block out more noise than other materials. The plug sits in the horse’s ear and is ..
From £25.99 (inc. VAT) £21.66 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo