100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Couplings and Chains

Synthetic coupling made by EJ Wicks with trigger clips for attaching to the bit. Used to lead horses up when bridled. ..
From £15.00 (inc. VAT) £12.50 (ex. VAT)
Synthetic leather coupling from Shepherds with buckled ends for attaching to the bit. Used to lead horses up when bridled. ..
From £19.95 (inc. VAT) £16.63 (ex. VAT)
Top quality English leather lead rein with a butterfly end for use when leading in-hand. Replaces a separate lead rein and coupling option. Brass fittings and loop end, approximately 6’6” in length. Leads can be personalised with a brass namepl..
From £58.50 (inc. VAT) £48.75 (ex. VAT)
Standard leather coupling made on site with brass buckle ends for attaching to the bit. Used to lead horses up when bridled. ..
From £32.50 (inc. VAT) £27.08 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo