100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Coat Care

Canter® Coat Shine helps repel grass stains, mud and soiling and provides an oil free shine, leaving the coat non-greasy. This multi-use coat conditioner not only makes the application of quarter markings easy but can also be applied to the chest and..
From £12.50 (inc. VAT) £10.42 (ex. VAT)
With immediate results, Canter’s Stain Master is ideal for removing dirt and manure stains with no need to rinse. Fantastic for last minute show touch ups as an ‘on the spot’ brightener for white markings. Stain Master can also be used as a dry shamp..
From £12.50 (inc. VAT) £10.42 (ex. VAT)
Refreshing, naturally scented, no-rinse body wash for horses. Easy and convenient to use, simply add one capful to 5 litres of water and use to wash down hot or sweaty horses. ..
From £8.99 (inc. VAT) £7.49 (ex. VAT)
Canter® Mane and Tail Spray is never equalled in its ability to keep the mane and tail sleek, tangle-free and luxuriously soft. This powerful detangler is one of our most popular products and is a favourite around the world. This original, long-lasti..
From £12.50 (inc. VAT) £10.42 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo