100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Waterproofs

PC Racewear’s RainArmor Coat is designed to provide superior protection from wet weather. Suitable for use across the seasons, this provides the ultimate weapon against the rain. Features: Waterproof outer shell Smooth Soft PU Fabric Nav..
From £92.00 (inc. VAT) £76.67 (ex. VAT)
Beat the rain in style with these RainArmour riding trousers from PC Racewear. These trousers are weatherproof and designed with a comfortable riding fit, making it possible to enjoy every day no matter the weather. With these trousers, rainy days ar..
From £76.00 (inc. VAT) £63.33 (ex. VAT)
The Ornella Prosperi Unlined Waterproof Trousers are lightweight, durable, 100% waterproof and breathable with taped seams. Below is a guide to the sizes (waist size). XS = 23” S = 25” M = 27” L = 29” XL = 31”     ..
From £49.50 (inc. VAT) £41.25 (ex. VAT)
Similar to Ornella’s Mud Race Breeches these are made of the same waterproof, rubberised fabric but are designed with a longer leg to go over the top of your boots. Ideal for particularly bad weather. Velcro fastening at the ankle and adjustable w..
From £94.95 (inc. VAT) £79.13 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo