100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Gloves

Protecting hands from the elements, the new MacWet Climatec ® glove range has been developed for use in cooler weather. As well as their unique Aquatec ® fabric ensuring superb grip and sensitivity, the Climatec ® gloves offer increased warmth and co..
From £44.50 (inc. VAT) £37.08 (ex. VAT)
If you are looking for more wrist coverage, these MacWet long gloves finish just above the wrist and have a thick elasticated cuff for a secure fit. The glove fastens easily using a durable Velcro strap. All grip and no slip - these MacWet Aquatec ® ..
From £36.99 (inc. VAT) £30.83 (ex. VAT)
All grip and no slip - these MacWet Aquatec ® gloves have the great grip so crucial for horse riding. Even in the wettest conditions MacWet gloves will give you 100% grip so your performance isn’t hindered. The short glove finishes at the wrist and h..
From £36.99 (inc. VAT) £30.83 (ex. VAT)
These super smart insulated gloves will keep you totally dry and warm in the wettest and coldest of weathers! They are slip-proof and warm without being bulky. Features: Flexible, technical glove for wet and cold weather Great control, gri..
From £34.95 (inc. VAT) £29.13 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo