100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Clippers and Trimmers

The Classic cordless trimmer from Liveryman provides a professional finish every time. Features: Precise and powerful Ideal for trimming faces, legs, feathers, tidying hogged manes, blending and precision clipping Can also be used for pe..
From £139.95 (inc. VAT) £116.63 (ex. VAT)
The perfect addition to any grooming kit, the Liveryman Nova has been designed with agility in mind. The Nova’s shape and weight make it easy to manoeuvre. Perfect for show preparation, tidying-up or maintaining clip lines. Features: Fully a..
From £59.95 (inc. VAT) £49.96 (ex. VAT)
A rechargable battery trimmer with digital display from Wolseley. Features: Rechargeable via provided USB cable LED Displays % of battery remaining 90-minute run time 120-minute recharge time Adjustable blade height from 0.8mm to 2.0..
From £65.00 (inc. VAT) £54.17 (ex. VAT)
Wolseley’s light duty Lapwing II clipper/trimmer can be run off its rechargable battery, or off the mains, and benefits from two speed settings. Features: No.10 wide 2.4mm blades Quiet 30-watt motor Dual power options Two interchangabl..
From £155.00 (inc. VAT) £129.17 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo