100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Chifney

Designed for leading not riding. Useful when leading difficult or strong horses or those that are likely to rear. The leather cover makes it a little softer in the horse's mouth than the standard Chifney. Comes with a stitched on leather head. ..
From £56.00 (inc. VAT) £46.67 (ex. VAT)
Designed for leading not riding. Useful when leading difficult or strong horses or those that are likely to rear. The rubber covered straight bar chifney makes this a more gentle version than the standard Chifney. Use in conjunction with a chif..
From £33.99 (inc. VAT) £28.33 (ex. VAT)
Designed for leading not riding. Useful when leading difficult or strong horses or those that are likely to rear. Use in conjunction with a chifney headpiece. Stitched on option available. ..
From £13.95 (inc. VAT) £11.63 (ex. VAT)
Used to help gain instant control of a horse which is acting up. Features: Leather covered chain Elastic on both cheeks to ensure equal pressure Trigger clip for ease of removal Removable double buckle coupling at the back for leading ..
From £75.00 (inc. VAT) £62.50 (ex. VAT)

Customer Reviews

There are no reviews for this product.

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo