100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Chains and Ties

Accepts 2.5cm (1") wide strap. Sold in singles...
From £4.50 (inc. VAT) £3.75 (ex. VAT)
Die cast zinc. Sold in singles..
From £2.25 (inc. VAT) £1.88 (ex. VAT)
Hose covered 70 cm chain ideal for securing horses in stables or floats. Panic clip at one end for quick release in an emergency. ..
From £20.99 (inc. VAT) £17.49 (ex. VAT)
Half rack chain widely used in racing for securing horses. Strong metal chain covered in black plastic.Panic clips both ends for quick release in an emergency...
From £19.50 (inc. VAT) £16.25 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo