100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Bridlework Accessories

Made from a pliable gel material, these bit guards are easy to fit and offer a soft, contoured alternative to traditional bit guard designs. The bulb shape allows the guard to stabilise the bit and minimise movement, which thereby prevents rubbing..
From £10.75 (inc. VAT) £8.96 (ex. VAT)
Rubber bit guards to help prevent the bit pinching the horse's lips. Sold in pairs. ..
From £1.60 (inc. VAT) £1.33 (ex. VAT)
Silicone bit guards to help prevent the bit pinching the horse's lips. Super stretchy for easy application. Sold in pairs. ..
From £2.99 (inc. VAT) £2.49 (ex. VAT)
Replacement parts for the Zilco Marathon bridle. Made from Zilco coated webbing, the Arab size has been designed to fit most Arabian type horses however it offers enough adjustment to fit some larger horses. Stainless steel fittings. Sold as a ..
From £22.99 (inc. VAT) £19.16 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo