100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Breastplates

Leather and elastic breastgirth that allows freedom more flexibility than a standard leather breastplate. Designed for racing. Features: Trigger clips attach to D rings on the saddle Quick to attach and remove Fully adjustable top straps..
From £108.00 (inc. VAT) £90.00 (ex. VAT)
Synthetic girth loop from Zilco designed to loop over the girth and allow you to attach training aids, martingales and other clip ended attachments to the girth as required. One size. ..
From £6.75 (inc. VAT) £5.63 (ex. VAT)
O Shepherds all elastic breastplate with black synthetic straps designed for use in horse racing. One size. ..
From £41.95 (inc. VAT) £34.96 (ex. VAT)
O Shepherds all elastic breastplate with black synthetic straps designed for use in horse racing. One size – Pony. (Larger size available in the general Breastplate section.) ..
From £41.95 (inc. VAT) £34.96 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo