100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Travel Boots

Tough outer shell, fleece lined with easy clean polyester strip at bottom. Note: Only available in navy. ..
From £69.95 (inc. VAT) £58.29 (ex. VAT)
Short travel boots with tough nylon outers and thick synthetic sheepskin linings to protect your horses legs whilst travelling. The shorter height is more readily accepted by horses that are not used to travel boots. Strong adjustable touch clo..
From £32.99 (inc. VAT) £27.49 (ex. VAT)
Highly protective yet breathable, these boots tick all the boxes for travelling. A tough nylon outer is combined with dense padding to withstand knocks and blows to the legs whilst on the move. Temperature regulation is aided by an Air Motion lining...
From £67.99 (inc. VAT) £56.66 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo