100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Therapy Boots

Versatile therapeutic boots for the lower leg to treat ligaments and tendons. Use hot or cold to assist with recovery after strenuous exercise or injury, reduce swelling, encourage blood flow to reduce inflammation, relieve pain, relax tight muscles ..
From £44.99 (inc. VAT) £37.49 (ex. VAT)
Replacement ice pack for ARMA Hot/Cold Relief Boots. ..
From £10.95 (inc. VAT) £9.13 (ex. VAT)
Ice-Vibe® Knee Wrap for cooling horses' knee area. Ice packs are used in conjucntion with the vibrating panels in the boots to reduce soreness and swelling, boost circulation and stimulate headling. Contoured to fit the knee while maintaining full mo..
From £197.50 (inc. VAT) £164.58 (ex. VAT)
Ice-Vibe® Hock Wrap for cooling horses' hock area. Ice packs are used in conjucntion with the vibrating panels in the boots to reduce soreness and swelling, boost circulation and stimulate headling. Contoured to fit the hock while maintaining full mo..
From £197.50 (inc. VAT) £164.58 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo