100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Horse Boots

Magnets have been used for many years for maintaining healthy blood flow around the body of both humans and horses. The N.E.W Magnetex Brushing Boots are fitted with six Neodymium magnets at a strength of 1600 gauss each, which have been strategicall..
From £90.00 (inc. VAT) £75.00 (ex. VAT)
Next level protection for equine athletes!  ARMA’s Carbon XC boots provide the ultimate defence for digital flexor tendons and suspensory ligaments when galloping and jumping cross country. TRIPLE IMPACT SUPPORT SYSTEM: Three layer system looks..
From £54.99 (inc. VAT) £45.83 (ex. VAT)
These Impact sport boots provide award winning protection without compromising on fit, breathability, flexibility or weight. Features: Specially designed front and hind boots Scientifically tested five-layer protection system Won’t hold ..
From £79.99 (inc. VAT) £66.66 (ex. VAT)
Next level protection for equine athletes!  ARMA’s Carbon XC boots provide the ultimate defence for digital flexor tendons and suspensory ligaments when galloping and jumping cross country. TRIPLE IMPACT SUPPORT SYSTEM: Three layer system looks..
From £56.99 (inc. VAT) £47.49 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo