100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Body Protectors

The Motion3 is Racesafe’s latest generation of equestrian body protection. It combines greater segmentation, innovative multi-foam technology, advanced breathability, and redesigned sizing for a perfect fit. It suits young riders and adults requi..
From £297.00 (inc. VAT) £247.50 (ex. VAT)
The Motion3 is Racesafe’s latest generation of equestrian body protection. It combines greater segmentation, innovative multi-foam technology, advanced breathability, and redesigned sizing for a perfect fit. It suits young riders and adults requi..
From £184.00 (inc. VAT) £184.00 (ex. VAT)
RaceMotion 2 is the latest level 2 racing protection launching in 2023. Designed in conjunction with international racing authorities and jockeys, it introduces MotionGuard technology to offer level 2 protection with improved comfort, weight and p..
From £295.00 (inc. VAT) £245.83 (ex. VAT)
The ProRace 3.0 offers the highest available level of protection at leading comfort and weight levels. Combining maximum protection with unrestricted movement & flexibility.   An update to the popular Jockey Vest Level 3, incorporating a new el..
From £256.00 (inc. VAT) £213.33 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo