100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Slip Heads

Designed for leading not riding. Useful when leading difficult or strong horses or those that are likely to rear. Hand stitched onto an English leather slip head. ..
From £40.95 (inc. VAT) £34.13 (ex. VAT)
Synthetic web slip head from Zilco for use with Chifney bits. Buckle attachments. ..
From £16.99 (inc. VAT) £14.16 (ex. VAT)
Leather slip head for use with Chifney bits. Stitched on to your chosen bit with a buckle adjustment on one side. Can be made with a trigger clip on one size for easy removal. One size (Full) – Other sizes can be made if required. Please con..
From £27.43 (inc. VAT) £22.86 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo