100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Racing

The hollow mouthpiece makes this bit very light despite being slightly thicker at 21mm. The nutcracker action works by applying pressure to the bars and squeezing the tongue. ..
From £19.80 (inc. VAT) £16.50 (ex. VAT)
Large 3.5” loose rings on this hollow mouth bit help to prevent the bit being pulled through the horse’s mouth. The thick hollow mouth keeps the bit lightweight making it ideal for racing. ..
From £18.60 (inc. VAT) £15.50 (ex. VAT)
Used by some of the biggest racing operations in the world, the Triabit has fast become an extremely popular choice on the race track. Features: Kinder and gentler on the horse while providing better control for the jockey Does not pull in..
From £72.95 (inc. VAT) £60.79 (ex. VAT)
This is a modified version of the original Triabit using a 5” solid steel snaffle with a plastic layer. It retains the same attributes as the original design but the lighter weight and plastic outer layer on a slightly smaller snaffle has shown to be..
From £75.95 (inc. VAT) £63.29 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo