100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More General Purpose

Large 3.5” loose rings on this hollow mouth bit help to prevent the bit being pulled through the horse’s mouth. The thick hollow mouth keeps the bit lightweight making it ideal for racing. ..
From £18.60 (inc. VAT) £15.50 (ex. VAT)
A thinner mouthpiece than the hollow mouth eggbutt at 15mm and smaller rings to maintain proportion. Uses a nutcracker action. ..
From £21.60 (inc. VAT) £18.00 (ex. VAT)
A kinder action that the jointed eggbutt, the French link in this bit means pressure is applied to both sides of the tongue but should not come into contact with the palate when in action. 14mm mouthpiece thickness. ..
From £20.70 (inc. VAT) £17.25 (ex. VAT)
A kinder action that the jointed mouth, the French link in this bit means pressure is applied to both sides of the tongue but should not come into contact with the palate when in action. Loose rings allow more movement in the horse's mouth. 17m..
From £16.50 (inc. VAT) £13.75 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2025 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo