100% Secure Shopping
  • 24hr delivery
  • Bespoke work
  • 01488 71766
Bridleway Extra Long Lead Rope

Bridleway Extra Long Lead Rope

From £6.99 (inc. VAT) £5.83 (ex. VAT)

Extra long leadrope with a swivel trigger clip.

3m long

Wish List Compare

More Stirrups

These new STS aluminium race irons are ultra lightweight and features an extended foot bed to give the jockey greater stability and supporting the lower leg. Features: Strong yet lightweight – only 95 grams Extended foot bed Popular with..
From £124.95 (inc. VAT) £104.13 (ex. VAT)
The race irons have been covered in leather over the tread to provide extra grip for the rider in all weathers. A popular choice with National Hunt jockeys. Black or Brown leather. ..
From £49.95 (inc. VAT) £41.63 (ex. VAT)
Light racing stirrups from Zilco weighing 140g per pair. Features: Angled platform tread for foot gives extra stability 10cm wide Encourages the heel to stay down Choice of colours available. ..
From £26.50 (inc. VAT) £22.08 (ex. VAT)
Aluminium stirrups from Zilco with PVC cover for extra grip.Features:Two widths availableWeight: 9cm - 250g per pair, 10cm - 270g per pair...
From £26.75 (inc. VAT) £22.29 (ex. VAT)

Customer Reviews

Write A Review

Please login or register to review
© 2024 E.J. Wicks Ltd. All rights reserved.
Web design by Cotswold Web
100% Secure Shopping PayPal Mastercard Maestro Visa Solo